Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/townrock/wp-includes/functions.php on line 6121
Bildeston Low Carbon Heat Network Technology Appraisal – TownRock Energy Skip to main content
TownRock Energy
search
Menu
  • About Us
    • Technology
    • Services
    • Why TownRock?
  • Projects
  • News
  • Careers
  • Contact
  • #climateemergency
  • search
Press enter to begin your search
Close Search

Bildeston Low Carbon Heat Network Technology Appraisal

  • November 25, 2022

Date: July 2022 – September 2022
Location: Bildeston, Suffolk, England
Client: Public sector client
Stage: Pre-Feasibility

TRE was contracted to conduct an appraisal of low-carbon heat network options for the town of Bildeston, a second project funded through the Rural Community Energy Fund (RCEF). A combination of geological and hydrological assessments, as well as analysis of low-carbon heating technology options, were reported to the client. The area boasted strong aquifer potential with good estimations of flow rate available, thus multiple technology options were presented: either an open loop water source heat pump system or a closed loop ground source system with the contribution of air source heat pumps as part of a hybrid configuration.

  • Previous ProjectGrantchester Decarbonisation Initiative - Technology Options Appraisal

  • Next ProjectScottish Council Pre-feasibility Study for Mine Water Geothermal Energy Hub

Share Share
Contact
  • Phone: +44 7425 338 315
  • Email: hello@townrock.com
  • Company No. SC454937
  • VAT No. 171 3361 29
Policies
  • Data Protection
  • Privacy
  • Health & Safety
  • Business Terms & Conditions
Address
Operations Office

36 St Andrews Square
Edinburgh
EH2 2AD

Registered Office

East Woodlands House
Dyce
Aberdeen
AB21 0HD

© 2025 TownRock Energy.

Close Menu
  • About Us
    • Technology
    • Services
    • Why TownRock?
  • Projects
  • News
  • Careers
  • Contact
  • #climateemergency