Heat from Mines feasibility study, West of England

West of England Mayoral Combined Authority – Heat from Mines project

The West of England Mayoral Combined Authority (WEMCA) set an ambitious target to be net zero by 2030, having actioned a strategic plan across the authority region covered by Bath & North East Somerset, Bristol, and South Gloucestershire. WEMCA funded the Heat from Mines project, which aimed to investigate the potential for one or more operational mine water heating, cooling, or thermal storage schemes in the region. The area has a long history of coal mining, dating back to the 13th century, which presents an opportunity to reuse the now abandoned mines for renewable energy.

Historic geological cross-section of the Kingswood Anticline, near Fishponds and Speedwell Pit
Historic geological cross-section of the Kingswood Anticline, near Fishponds and Speedwell Pit.

At a glance

Client
West of England Mayoral Combined Authority (WEMCA)
Location
Bath & North East Somerset, Bristol, and South Gloucestershire
Technology
Mine water heating, cooling, and/or mine thermal energy storage (MTES)
Sites
Five shortlisted sites down from 25
Capacity
Combined 15 MW heating, cooling, or storage capacity across all five sites; 1.25–4 MW per site
Carbon saving
Opportunity to save 2,860 tonnes CO2 per year
Capital cost
Combined £4 million, ranging from £400k to £1.1 million per site
Study dates
April–September 2025, including site visits
Sector
Public (local government)
Scope
Largest and most detailed feasibility study on these mines to date
TownRock's role
Project technical feasibility and design.

The challenge

A number of supporting studies predated the Heat from Mines project, illustrating the desire from WEMCA to progress change at pace for the communities and places in the local area.

  • Vast quantities of sites to screen at the beginning, and information to digest from the client, including previous studies.
  • Mines across the region are particularly poorly characterised due to their age and complex geological structure, increasing subsurface uncertainty at the desktop stage.
  • Constantly developing future plans for sites meant that understanding client priorities was key from the outset.
  • Mines in this area have not yet been reused for geothermal energy or storage, so all designs were first-of-a-kind.

What we did

TownRock Energy were commissioned by the West of England Mayoral Combined Authority (WEMCA) to conduct a detailed desktop study evaluating the suitability of mine water for heating, cooling, and thermal energy storage at five different sites across the southwest of England. TRE delivered a fully informed decision-making framework to aid the client when progressing the chosen sites for the next stage of development – exploratory drilling.

By investigating the history, geometry, and characteristics of the local coal mines via literature and mine abandonment plans, a conceptual model for each site was developed to communicate the subsurface setting to the client. This enabled numerical modelling to be conducted using GEMSToolbox software and TRE’s in-house Heat In Place tool, to forecast the thermal resource.

Supported by these results, the following was provided to the client:

  • Optimal proposed system locations, sizes and designs for each site.
  • Bespoke capital cost estimates based on the TRE in-house drilling costing tool.
  • Operational cost estimates with predicted carbon savings based on the system capacity.
  • Costs normalised to “per MW” for comparison between sites.
  • An overview of risks associated with each site and proposed system.
  • An outline of the regulatory pathway required from project conception to operation.

What it delivers

TRE selected subsurface criteria to compare the five sites across, e.g., scale of opportunity, depths, temperatures, drilling complexity, costs, CO2 savings. The criteria were then weighted to favour factors which minimise operational and permitting risk. The favourable site was recommended based on the weighted factors and proposed to the client for development. Fortunately, it was concluded that a system could feasibly be developed at any of the five sites.

TRE have continued to assist the client when planning next steps beyond the Discover Phase. This has included providing guidance for Principal Designer processes and costs for the drilling and delivery of a system.

TRE aspire to support clients from the beginning of their geothermal journey, through installation and operation of a fully functioning system. TRE are positioned to support with operation and maintenance across the full lifespan of the system.

In their words

The Heat from Mines project group are pleased with the high quality of the work undertaken on the detailed desktop studies phase. TownRock Energy are communicative, flexible and demonstrate real passion and expertise in the subject area. We have enjoyed working with them and would recommend their services for mine water studies.
Rich GreenEnvironmental Project Officer, West of England Combined Authority