West of England Mayoral Combined Authority – Heat from Mines project
The West of England Mayoral Combined Authority (WEMCA) set an ambitious target to be net zero by 2030, having actioned a strategic plan across the authority region covered by Bath & North East Somerset, Bristol, and South Gloucestershire. WEMCA funded the Heat from Mines project, which aimed to investigate the potential for one or more operational mine water heating, cooling, or thermal storage schemes in the region. The area has a long history of coal mining, dating back to the 13th century, which presents an opportunity to reuse the now abandoned mines for renewable energy.
A number of supporting studies predated the Heat from Mines project, illustrating the desire from WEMCA to progress change at pace for the communities and places in the local area.
TownRock Energy were commissioned by the West of England Mayoral Combined Authority (WEMCA) to conduct a detailed desktop study evaluating the suitability of mine water for heating, cooling, and thermal energy storage at five different sites across the southwest of England. TRE delivered a fully informed decision-making framework to aid the client when progressing the chosen sites for the next stage of development – exploratory drilling.
By investigating the history, geometry, and characteristics of the local coal mines via literature and mine abandonment plans, a conceptual model for each site was developed to communicate the subsurface setting to the client. This enabled numerical modelling to be conducted using GEMSToolbox software and TRE’s in-house Heat In Place tool, to forecast the thermal resource.
Supported by these results, the following was provided to the client:
TRE selected subsurface criteria to compare the five sites across, e.g., scale of opportunity, depths, temperatures, drilling complexity, costs, CO2 savings. The criteria were then weighted to favour factors which minimise operational and permitting risk. The favourable site was recommended based on the weighted factors and proposed to the client for development. Fortunately, it was concluded that a system could feasibly be developed at any of the five sites.
TRE have continued to assist the client when planning next steps beyond the Discover Phase. This has included providing guidance for Principal Designer processes and costs for the drilling and delivery of a system.
TRE aspire to support clients from the beginning of their geothermal journey, through installation and operation of a fully functioning system. TRE are positioned to support with operation and maintenance across the full lifespan of the system.
The Heat from Mines project group are pleased with the high quality of the work undertaken on the detailed desktop studies phase. TownRock Energy are communicative, flexible and demonstrate real passion and expertise in the subject area. We have enjoyed working with them and would recommend their services for mine water studies.