Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/townrock/wp-includes/functions.php on line 6121
MD Presenting at All-Energy – TownRock Energy Skip to main content

Our MD gave a talk today at the 2018 All-Energy trade show, the biggest renewable energy conference in the UK calendar. The topic was a comparison of all of the various types of minewater geothermal system design. David asked the audience member from SEPA which system design made him the most nervous, and his response was “the one which has longest distance between the production and injection boreholes”. This may pose a challenge for the largest scale of minewater heat network, but solutions are available including partitioning the mine workings with multiple borehole doublets.

Leave a Reply